Tuesday, July 6, 2010

4th of July

It rained (lighting and thunder) for four days, so this weekend we didn't get much done.  Warren has the front holding tank and the waste treatment box in. We are having the local dealer do the wiring, just to make sure its done right so there is no problems with the warrenty. We saw another CSY that caught fire,and we sure don't want that to happen to us!!!

This was a FULL double rainbow really vivid. Gods Promise:)

Up He Goes



He made it half way! Now he will try everyday to make it up to the top. It takes time to get accustom to all the gear. It's a good thing he lost 20lbs, I think he wants to lose more really soon:) 

Climbing the Mast

Warren decided to get some instruction before climbing the mast.  We looked on the web and found Vertical Ventures. He took a 2 hour lesson from the co-owner Chris which covered safety, equipment usage, repelling and ascending. Chris is a really good climber and made instructions simple to understand  and look easy!  Warren could get hooked on climbing, but he has to much boat repair to do to even think about it.